4 MW of Powered Data Center Space. Ready in 30 Days, Not 30 Months.
Flexible 50 kW to 2.5 MW deployments for AI compute, GPU workloads, neocloud overflow, and high-density infrastructure that can't wait 12-18 months. Two Cincinnati-area buildings, 1.25 miles apart.
Our two Cincinnati buildings were purpose-built for high-density compute. With 4 MW now available for colocation tenants, you can deploy in weeks — not the 12-18 months traditional providers quote.
Primary market data center vacancy hit 1.4% at year-end 2025. Most new capacity is precommitted through 2027. We have 4 MW available this quarter.
Built by Operators. Run by the People Who Use It.
VeriPic has run mission-critical SaaS infrastructure for law enforcement agencies since 1998. We built these Cincinnati facilities for our own production workloads — and today we have excess capacity we'd rather rent to operators who'll put it to work than let it sit idle.
Built by Operators, Not Brokers
You're not leasing from a real estate company that bought a building and added a generator. The team running this facility is the team that's been operating production infrastructure for 27 years. Faster technical decisions, real expertise, no learning curve at your expense.
No Resale Margin Pressure
Pure colocation providers have to maximize revenue per kilowatt — it's their entire business. Our data center operation is supplementary to a profitable SaaS company, which means flexibility on commercial terms, no pressure to nickel-and-dime power overages, and no incentive to oversubscribe capacity we don't have.
Skin in the Game
Our own production SaaS workloads run in these facilities alongside tenant deployments. When the cooling fails, it fails for us too. When the power flickers, our business goes down with yours. That's a structural commitment to uptime no pure colocation provider can match.
Why Tenants Choose Cincinnati
Centrally located with low-latency access to Chicago, NYC metro, and Atlanta. Low natural disaster risk. Competitive Ohio energy costs.
Available Now, Not in 18 Months
While Tier III providers quote 12-18 month wait times, we have 4 MW ready today. Move in as fast as 30 days for standard configurations.
No Long-Term Contracts Required
Month-to-month and short-term commercial structures available. Scale up or down as your needs evolve. True flexibility.
Direct Ownership
Work directly with the facility team, not a broker or account manager three layers deep. Faster decisions, real relationships.
Industrial Cooling & Compute
Industrial cooling, 480V three-phase distribution, and power density designed for workloads other facilities can't host.
Why Teams Are Looking Beyond Tier III
Traditional enterprise colocation is built for a different problem. Here's how we compare.
| Traditional Tier III | VeriPic Cincinnati | |
|---|---|---|
| Wait time | 12-18 months | Available now |
| Minimum commitment | 250 kW+ typical | 50 kW |
| Contract length | 5-10 year minimum | Flexible |
| Best for | Mission-critical SLA apps | High-density compute, AI, HPC |
| Flexibility | Standardized configurations | Tenant-specific designs |
| Formal uptime SLA | 99.999% guaranteed | Workload-appropriate |
Built For These Workloads
Purpose-built infrastructure for the compute-intensive applications that matter.
AI Training, Inference & GPU Compute
Power and industrial cooling for H100, H200, and MI300X workloads where production redundancy is handled at the application layer.
Backup & Disaster Recovery
Geographic redundancy with two buildings 1.25 miles apart. Predictable costs, no egress fees.
Hybrid Cloud Deployments
Extend your cloud infrastructure on-premises. Direct connectivity to 3 ISPs. Optimize cost and performance across your stack.
Crypto & HPC Workloads
Industrial cooling designed for sustained high-density loads. Proven track record with compute-intensive applications.
A Practical Alternative to Enterprise Data Centers
This isn't a hyperscale Tier III campus. It's flexible powered data center space for teams that value speed, power availability, and cost flexibility.
✓ Best Fit For
- AI training, inference, and GPU compute
- Neocloud and bare-metal operators
- Containerized and modular deployments
- Backup and disaster recovery infrastructure
- HPC, batch compute, and lab environments
✗ Probably Not the Right Fit For
- Mission-critical workloads requiring formal Tier III certification
- Buyers who require a major carrier hotel ecosystem
- Organizations needing a fully managed hyperscale facility
Our Cincinnati Facilities
Two strategically located powered shell data centers with complementary specs.
| Specification | Building 1 | Building 2 |
|---|---|---|
| Available Power | 1.5 MW (3000A @ 480V) | 2.5 MW (2000A @ 480V) |
| Space | 11,280 sq ft, 11 ft ceiling | 18,000 sq ft, 20 ft main / 15 ft intake |
| Cooling | 10 exhaust fans + evaporative | 4 × 48" high-power fans + evaporative |
| Access | Oversized garage door | Oversized garage door + loading dock |
| Expansion | 0.5-acre outdoor yard for containers | Room for 12+ additional fans |
| Best For | Container deployments, growing tech | Larger GPU clusters, modular expansion |
Location: Two buildings 1.25 miles apart for geographic redundancy and operational flexibility.
What's Available
Transparent process from inquiry to deployment.
Available on Request
- Power review
- Facility specs and documentation
- Site tour scheduling
- Site photos
- Pricing and power billing structure
Under NDA
- Detailed utility documentation
- Exact addresses
- Equipment inventory
- Tenant-specific deployment plans
- Floor plans and configuration details
- Power diagrams
Frequently Asked Questions
Common questions about our powered shell data center offering.
No. These are powered-shell facilities with industrial cooling, designed for high-density compute workloads where production redundancy is handled at the application layer. Best fit for AI training, HPC, and container-based deployments rather than mission-critical enterprise apps with 99.999% SLA requirements.
We offer flexible deployments from 50 kW to 2.5 MW, with configurations tailored to your specific requirements. Contact us for a power review to determine the best fit for your workload.
Yes. Our facilities are purpose-built for high-density compute, with industrial cooling and 480V three-phase distribution designed for H100, H200, and MI300X clusters and similar workloads.
Spectrum: Fiber connectivity
Cincinnati Bell: Fiber connectivity
Starlink: Satellite redundancy
Redundant connectivity options ensure your workloads stay online. Mix and match ISPs for optimal performance and resilience.
Yes. Our on-site team provides remote hands support, including equipment installation, troubleshooting, and maintenance. Rates and availability vary by deployment size.
Yes. Facility tours are available by appointment after an initial power review and qualification call. We'll schedule a time that works for your team.
Get Started Today
Tell us about your power and space needs. We'll get back to you within 1 business day with availability and pricing.